Where 35Km away need to be?
Tony Costa
madunix wrote:
> Disaster Recovery (DR)Preparation
>
> We do Oracle10g CRS (no _HACMP_) on 2xNodes AIX5.3 connected to FC SAN
> DS4800 to serve our members which is a real time application.we
> planning to do a Disster Recovery plan for this service,DR plan need to
>
> recover 1 hour max time, the site will be about 35Km away,system must
> be restored to the last transaction, on the backup site we are thinking
>
> to palce the same identical hardware of our Production, AIX Servers and
>
> SAN DS4800Our data will be mirrored across a WAN link E1.
>
>
> Is there anyone that have some experience of Veritas, TSM or STORIX for
>
> DR from point of view as DBA.
>
>
> madunix
Received on Wed Dec 20 2006 - 07:58:04 CST