Oracle FAQ | Your Portal to the Oracle Knowledge Grid |
Home -> Community -> Mailing Lists -> Oracle-L -> RE: RAC no more HA after upgrading to 9.2.0.6?
What OS version are you are on?
This normally is related to a problem in the cluster manager. On Linux =
we had similar problems and had to upgrade the oracm.=20
-----Original Message-----
From: oracle-l-bounce_at_freelists.org =
[mailto:oracle-l-bounce_at_freelists.org] On Behalf Of Magni Fabrizio
Sent: Tuesday, February 01, 2005 12:06 AM
To: oracle-l_at_freelists.org
Subject: RAC no more HA after upgrading to 9.2.0.6?
Hello,
after upgrading a two nodes RAC from 9.2.0.4 to 9.2.0.6 I got a =
surprise.
If a node don't see a link up on it's interconnect NIC than it doesn't =
give anymore service.
For example, in my environment, when unplugging the interconnect one = node is evicted (rightly) but the other one, still up and running, = doesn't respond anymore as long as the interconnect link is down. If I = replug the cable the instance is back working again.
It means I cannot reboot one of the two nodes anymore since the other =
would stop working.
In previous RAC version the behaviour was different and RAC guaranteed =
high availability (sort of).
Is anyone experience the same issue?
Has anyone tried to unplug the crosscable or turn off the interconnect =
switch in a 9.2.0.6?
What's the result?
Any feedback is welcome.
Fabrizio
--
http://www.freelists.org/webpage/oracle-l
--
http://www.freelists.org/webpage/oracle-l
Received on Tue Feb 01 2005 - 03:29:07 CST