Oracle FAQ | Your Portal to the Oracle Knowledge Grid |
Home -> Community -> Usenet -> c.d.o.server -> Migration from 8.1.5 to 9.2 RAC
Hi, ALL!
I have Oracle 8.1.5 on Linux Red Hat.
And I have to migrate the database to Oracle 9.2 Real Application Cluster.
The current
volume of data is about 8 Gb. I can stop the database only for 10 hours.
I can see 2 ways of doing this.
And there is a question how to migrate from 9.2 single to 9.2 RAC. Will it be enough to install 9.2 RAC and to use unix dd command to transfer datafiles of 9.2 single database to the corresponding raw devices of 9.2 RAC database? What to do with the SYSTEM tablespace?
May be there are another ways of migration from 8.1.5 to 9.2 RAC?
Igor. Received on Thu Sep 12 2002 - 02:48:14 CDT