The upgrade doesn't take long at all, say 30 minutes for the actual
install and upgrade. However the preparation, backing up DB, changing
paths, .profiles, backup scripts documentation etc. is significantly
longer !
With the migration, assuming you are using the migration utility and not
import / export, then I would estimate the migration to take around 90
minutes. Again, it is the preparation, and the running of the catalog
upgrade scripts that can take an hour or more.
Good Luck
NeilC
Jonathan Gauthier wrote:
>
> I'm preparing an upgrade from 7.3.3.5 to 7.3.4 followed later by a migration
> from 7.3.4 to 8.1.5.
> I have to do it in two steps because of application compliance issues.
> I'd like to know what is the approximate time these two operations will take
> for a 20gig database.
> I only need estimations for the actual operation not counting backups and
> preparation. Just the time it takes for Oracle to convert the datafiles to
> the new version.
>
> The computer is a Sun ultrasparc 2 with 2 CPUs(300mhz) and 1 gig of RAM.
> Datafiles are spread on several disks.
>
> Please answer with a copy to my email address if possible.
>
> --
> ---
Received on Thu Jan 27 2000 - 03:22:21 CST
![]() |
![]() |