Oracle FAQ | Your Portal to the Oracle Knowledge Grid |
![]() |
![]() |
Home -> Community -> Mailing Lists -> Oracle-L -> RE: Lets load test
OK then, sure. Test fault injections. Fire up some heavily modify intensive workload (e.g., conventional path loads concurrently, several concurrent CTAS statements, etc) and drive the I/O up as far as possible then reach back to the HBA and pull the gbic. After Oracle melts down, reinstate the path to the SAN. Make sure ASM and Oracle can come up. Do this a few times.
-- http://www.freelists.org/webpage/oracle-lReceived on Wed Dec 14 2005 - 15:32:12 CST
![]() |
![]() |