I have 2 node RAC database running on 11.2.0.4 (RedHat Linux) with the memory utilization of about 80% (we have 140GB of memory) and we are expecting the application work load to increase by 10 times. The size of the database is 5TB. What are all the options that I should be looking into to address the increase in database workload to maintain or improve the performance?
Thanks
|
|
|
|
|
Re: Database options to address work load increase [message #656076 is a reply to message #655992] |
Wed, 21 September 2016 21:45 ![Go to previous message Go to previous message](/forum/theme/orafaq/images/up.png) ![Go to next message Go to next message](/forum/theme/orafaq/images/down.png) |
trantuananh24hg
Messages: 744 Registered: January 2007 Location: Ha Noi, Viet Nam
|
Senior Member |
|
|
caprikar wrote on Mon, 19 September 2016 15:22Hi,
I have 2 node RAC database running on 11.2.0.4 (RedHat Linux) with the memory utilization of about 80% (we have 140GB of memory) and we are expecting the application work load to increase by 10 times.
I have got a question same to Black Swan. How do you knew the memory utilization of RAC wasted 80%? What was the metric, utility or anything did you use to measure?
And, there are many reasons made bottleneck but not only memory.
140gb physical memory per server? Is it physical or virtual?
Quote:
The size of the database is 5TB. What are all the options that I should be looking into to address the increase in database workload to maintain or improve the performance?
Thanks
As John Waston suggestion, you might upload AWR (get the snaps between busy time) here, it will take a cleaner rather than guess.