I'm looking to this list for help on either of these issues. Thanks in
advance for your time. Please e-mail me privately
(saira_somani_at_yahoo.com) if this is not the proper forum for these
issues. Someone out there has to be using this product :-)
RDBMS Version: 8.1.7.0.0
Operating System and Version: Windows 2000 Server SP3
Error Number (if applicable):
Product (i.e. SQL*Loader, Import, etc.): Oracle 9i Lite
Product Version: 5.0.1.1
MSYNC - records to process yet PROCESSING does not occur
We have changed records on the client in offline mode and now want to syncronize with the server. There are records to be processed - yet, in MSYNC, it goes through COMPOSING, SENDING, RECEIVING but no PROCESSING. As a result, our records on the server are not updated. MGP is running, and when we retry, we allow for complete cycles to occur before our next attempt.
After trying about 20 times (no kidding), the PROCCESSING bar on the MSYNC screen works.
This is unacceptable and not to mention unreliable. Please help. Please also see my previous message on a related issue. Perhaps you can see a connection, I can't as yet.
Thanks,
Saira
RDBMS Version: 8.1.7.0.0
Operating System and Version: Windows 2000 Server SP3
Error Number (if applicable):
Product (i.e. SQL*Loader, Import, etc.): Oracle 9i Lite
Product Version: 5.0.1.1
MSYNC sticks on PROCESSING bar
Recently we made a change to a table in our repository in 8i - changed a
primary key. After this, the application was republished in Oracle 9i
Lite and all client databases (Pocket PC Strong ARM) were refreshed
(i.e. database was removed from the client and sync'd 3 times before
usage).
We have noticed that now, after the change, during the MSYNC process, that status bar hangs on the PROCESSING phase of MSYNC. The only way to rid this is by warm booting the PDA and trying it multiple times until it is successful (which sometimes it is and sometimes isn't). However, even when the PROCESSING bar has not completed until the end, the data from the PDA is sent but this is unreliable as all the MSYNC processes are not complete.
This is inefficient. Any suggestions?
Saira Somani
IT Support/Analyst
Hospital Logistics Inc.
-- Please see the official ORACLE-L FAQ: http://www.orafaq.net -- Author: Saira Somani INET: saira_somani_at_yahoo.com Fat City Network Services -- 858-538-5051 http://www.fatcity.com San Diego, California -- Mailing list and web hosting services --------------------------------------------------------------------- To REMOVE yourself from this mailing list, send an E-Mail message to: ListGuru_at_fatcity.com (note EXACT spelling of 'ListGuru') and in the message BODY, include a line containing: UNSUB ORACLE-LReceived on Thu Feb 06 2003 - 10:14:35 CST
(or the name of mailing list you want to be removed from). You may
also send the HELP command for other information (like subscribing).