Dear gurus..
Oracle DB 9i Release 2
currently, our report server can only run one report at time. therefore, is there are following jobs in the order of request (A, B and C)
Report Job A -- 5000 pages
Report Job B -- 10 pages
Report Job C -- 2 pages
Report Job B and C will have to wait for quite sometimes (20 minutes) before Report Server can generate Report Job A and B which take less than 1 minutes.
Is there way, that Oracle Report server can run multiple report (jobs) at same time? (e.g. distribute the time allocation for generating reports)
If so, how do I configure it? If not, any recommandation to resolve above mentioning problem.
Many Thanks & Best Regards