Database Sync [message #315336] |
Mon, 21 April 2008 03:25 |
stevefox777
Messages: 26 Registered: September 2006
|
Junior Member |
|
|
Hi,
I need to create a test database which will be in sync with the production database. The sync will be one way, from production to test database, so any changes made on the test database will be cleared when it gets synced. There is no need for the sync to be performed in real time but at least once per day is desired. Also, there is no need for the test database to be used as a backup database when the production database goes down. The test database will be on a separate server to the producion database connected with 100Mbs network. If you have any recommendations on what programs to use to achive this please let me know.
OS: HP-UX 11.11
Oracle version : 10.2.0.3.0
Steve
|
|
|
|